International Glass News

First Solar wins PG&E supply contract

First Solar Inc. said Tuesday it signed a deal to supply Pacific Gas & Electric Co. with power from a solar facility that will be built in Southern California.

First Solar plans to build the plant in eastern Riverside County near Desert Center. Construction is expected to begin by the end of this year and expected to be complete as early as 2013.

The power plant will use thin-film photovoltaic solar modules. It will have a total capacity of 550 megawatts, which is enough to power about 160,000 homes.

A portion of the power from the plant is already under contract with Southern California Edison. Both deals still need to be approved by the California Public Utilities Commission.

First Solar is based in Tempe, Ariz.

Its shares fell $2.72 to $105.92 in afternoon trading.




News material on the Site is copyright and belongs to the Company or to its third party news provider, and all rights are reserved. Any User who accesses such material may do so only for its own personal use, and the use of such material is at the sole risk of the User. Redistribution or other commercial exploitation of such news material is expressly prohibited. Where such news material is provided by a third party, each User agrees to observe and be bound by the specific terms of use applying to such news material. We do not represent or endorse the accuracy or reliability of any of the info contained in any news or external websites referred to in the news.


Search News

ADs
OGIS GmbH



Contact  Advertisement  Terms & Conditions

© 2000-2010 www.glassmachines.com - an OGIS affiliate